Birkhahnweg railway bridge
A new structure is to be erected. The displacement of line 6403 caused by the track layout will make two separate structures necessary.
Facts and figures
| Lines: | 6403, 6430, 6347, 6348 |
| Type of construction: | Single-bay half-frame |
| Headroom: | ≥ 4,37 m |
(Graphic: DB AG)
(Graphic: DB AG)




