German Unity Transport Project 8

 Nuremberg – Erfurt – Halle/Leipzig – Berlin

Kanenaer Weg railway bridges

The new bridges to be erected will carry lines 6349, 6403 and 6430 over Kanenaer Weg. The existing structures will be demolished completely. Replacement structures in the form of a reinforced concrete half-frame on shallow foundations are intended.

Facts and figures

Lines:6349, 6403, 6430
Type of construction:Half-frame
Minimum headroom:3,80 m

nach oben ^

The project VDE 8 is supported by :