Kanenaer Weg railway bridges
The new bridges to be erected will carry lines 6349, 6403 and 6430 over Kanenaer Weg. The existing structures will be demolished completely. Replacement structures in the form of a reinforced concrete half-frame on shallow foundations are intended.
Facts and figures
| Lines: | 6349, 6403, 6430 |
| Type of construction: | Half-frame |
| Minimum headroom: | 3,80 m |




