Augustaburg Tunnel
Augustaburg Tunnel (Photo: Nürnberg Luftbild, Hajo Dietz)
Facts and figures
| Tunnel length: | 1.404 m |
| Construction method: | as in mining |
| Completion: | 2005 |
(Graphic: DB AG)

| Tunnel length: | 1.404 m |
| Construction method: | as in mining |
| Completion: | 2005 |
The project VDE 8 is supported by :



