Lohmeberg Tunnel
Lohmberg tunnel (Photo: Nürnberg Luftbild, Hajo Dietz)
Facts and figures
| Tunnel length: | 688 m |
| Headroom: | 10,63 m |
| Clear width: | 10,64 m |
| Maximum depth below the surface: | 60 m |
| Emergency exit: | keine |
| Total excavated tunnel material: | approx. 125.000 m3 |
| Construction method: | as in mining |
The Lohmeberg Tunnel, which is 688 metres long, goes under Lohmeberg at a maximum depth of 60 metres. It is bordered by a steep slope in the Schobse Valley, where its southern portal is, and a gently rising slope at its northern portal. The land above this tunnel is also primarily managed forest.
(Graphic: DB AG)