Sandberg Tunnel
Sandberg tunnel (Photo: Nürnberg Luftbild, Hajo Dietz)
Facts and figures
| Tunnel length: | 1.320 m |
| Maximum depth below the surface: | as in mining |
| Construction method: | 2002 |
(Graphic: DB AG)

| Tunnel length: | 1.320 m |
| Maximum depth below the surface: | as in mining |
| Construction method: | 2002 |
The project VDE 8 is supported by :



