German Unity Transport Project 8

 Nuremberg – Erfurt – Halle/Leipzig – Berlin

Baumleite Tunnel

Baumleite Tunnel
Baumleite Tunnel (Photo: Nürnberg Luftbild, Hajo Dietz)

Fact and figures

Tunnel length: 1.317 m
Maximum depth below the surface: 30 m
Construction method: as in mining

The Baumleite Tunnel is located between the municipalities of Theuern, Truckenthal and Grümpen. Tunnelling began towards the south at the north portal. The excavated material is being taken from the north portal to the Galgenberg landfill next to the cutting at Theuern.

Map
(Graphic: DB AG)