Füllbach Tunnel
Füllbach Tunnel (foreground) (Photo: Nürnberg Luftbild, Hajo Dietz)
| Tunnel length: | 1.113 m |
| Construction method: | as in mining |
(Graphic: DB AG)

| Tunnel length: | 1.113 m |
| Construction method: | as in mining |
The project VDE 8 is supported by :



